The project is co-located within the existing Gullen Range Wind Farm occupies an area of approximately 64 hectares located in south east NSW. Locating the solar farm adjacent to the wind farm minimised required infrastructure (such as roads, power lines and telecommunications), which resulted in a reduction in environmental impact and project cost. RMA provided analysis of the imported solar panel frames to Australian standards and codes and provided CPEng certification.