This project involved widening and strengthening the existing pavement. Key tasks included: detailed design, client liaison, project management, structural assessment, constructability review, provision for traffic, preliminary and detailed design inputs and review, construction estimates and project documentation.
Design required efforts to minimise the roadway footprint and utilise earthworks generated within the site as embankment. Particular effort was taken to ensure that EDD provisions were met and that clearing requirements met the client’s expectations.